How it works

One capture in, measured status out

Every capture runs one sequence: reconstruct, register, inspect, forecast, answer. Your team captures and decides.

One capture cycleExample
07:00
Drone flight, 1,840 images
07:40
Upload complete
+ hours
Twin updated (design target)
Next morning
Status, flags and forecast ready

Illustrative timings; pilots will measure the real ones.

Sequence

The capture cycle, step by step

  1. CAP

    Capture the site

    Drone flight, 360 walk, phone scan or Roveon mission. Use what you already fly.

    Whenever you capture

  2. REC

    Reconstruct the twin

    Splatix builds a georeferenced, metric twin and diffs it against the last one.

    Design target: within hours

  3. REG

    Register to the design

    Aligna reads each IFC element: not started, in progress, installed or off design.

    Same run

  4. VIS

    Inspect

    Sentvue pins safety and quality issues to an element and a time.

    Same run

  5. FCST

    Forecast

    Cronex re-forecasts at-risk activities from observed progress.

    Daily

  6. ASK

    Answer and report

    Pilora drafts the owner summary and RFIs; a person approves.

    On request

Responsibilities

Who does what

TaskYour teamFramid
Fly or walk the captureYes, or hand it to RoveonPlans missions; flags coverage gaps
Provide model and scheduleIFC export, P6 or MS ProjectImports, maps activities to elements
Set tolerancesPer element classApplies them to every element
Reconstruction and registration—Runs every cycle
Decide what an issue meansYesShows the evidence and a suggested action
Send RFIs and reportsApprove and sendDrafts them

Cadence

How often to capture

Capture more often for earlier warnings, and match the cadence to the work.

Starting points, agreed in the pilot.
PhaseSuggested captureWhy
Earthworks and foundationsDrone, weeklyVolumes and pours from above
StructureDrone weekly + 360 walk per levelColumns, slabs and embeds
EnvelopeDrone weekly + façade passPanels, brackets, glazing
Fit-out360 walk twice a weekMEP, partitions and ceilings before close-up

FAQ

Questions about the sequence

What if a capture misses part of the site?

The twin marks it as not seen instead of guessing, and Roveon can plan a mission to fill the gap.

Can we start mid-project?

Yes. The first capture becomes the baseline; earlier progress comes from your schedule.

What about temporary works and clutter?

Scaffold, formwork and stored materials are recognised and never counted as installed.

Next step

Walk through one capture cycle

Bring a recent capture and your model, and we run each step on your data.