Pilora is in design and early build
Pilora · Ask
Ask the project, get an answer with sources
Pilora answers from the twin, schedule, plans and specs, cites every claim, and drafts RFIs and owner updates for approval.
Which areas are behind, and why?
Level 5 slab bays on grid lines C–D are behind: formwork was not in the 14 Apr capture [cap-0414]. Cronex moves the L5 pour about 6 days [A5110]. Column C-14 on L4 is 38 mm off design and has a draft RFI [RFI-118].
Draft the owner update for Monday.
Draft ready for your approval: progress 64% against 69% planned, two risks, one RFI open. Nothing is sent until you approve.
Illustrative conversation. Bracketed codes are citations.
Capabilities
What Pilora does
Grounded, cited answers
Every claim links to an element, capture, activity or document page.
Drafts, not sends
RFIs, owner reports and issue routes wait for a person to approve.
Portfolio questions
Ask across projects: where are we behind this month?
Specification
Pilora at a glance
| Item | Detail |
|---|---|
| Sources | Twin, element graph, issues, forecasts, schedule, drawings, specifications |
| Model | NeMo-based retrieval and reasoning, served as NIM microservices |
| Actions | Draft RFI, owner report, issue route; all approval-gated |
| Guardrails | Project and role scope; citation required for every claim |
| Status | Pre-launch; voice interface planned |
Loop
Where Pilora sits in the loop
FAQ
Pilora questions
What if Pilora doesn't know?
It says so and shows what it searched. An answer without a source is not shown.
Can it send an RFI by itself?
No. Pilora drafts; a named person approves and sends.
Next step
Ask your own project a question
Bring a model, a schedule and a capture. We load them and you ask.