Solutions
One twin, read four ways
Contractors recover the schedule, owners trust the report, lenders release the draw. All from the same measured evidence.
- Contractors
- Project controls, VDC, field
- Owners
- Owner's reps, development leads
- Infrastructure
- Civil and linear builders
- Finance
- Lenders, insurers, monitors
General contractors
Run the Monday meeting on measured status
Element-level progress, deviations and forecasts, ready before the meeting starts.
- Progress by activity, read from the twin
- Off-design elements caught before the next trade
- Slip forecasts with the cause named
- This week
- 64% installed vs 69% planned
- Off design
- 3 elements, RFIs drafted
- At risk
- L5 pour, about 6 days
Owners and developers
Progress you can check, not just read
See the twin the contractor sees, with evidence behind every progress claim.
- Independent percent complete
- Portfolio roll-up and pay-application evidence
- As-built twin at handover (planned)
- Projects
- 4 active
- Behind plan
- 1 project, L5 structure
- Next milestone
- Topping out, forecast +6 days
Infrastructure builders
Long sites, phased work, one twin
Drone captures turn corridors that are hard to walk into progress by chainage.
- Earthworks volumes between captures
- Structures registered to design
- Progress by chainage and phase
- Chainage
- km 3.2 – 7.8 captured
- Earthworks
- Cut and fill against design
- Structures
- 2 of 5 bridges at deck level
Lenders and insurers
Evidence behind every draw and risk review
Time-stamped status without waiting for the next site visit.
- Independent progress for draw requests
- Forecast risk across a loan book
- Every figure linked to its capture
- Draw 7
- Claimed 68%, twin shows 64%
- Evidence
- Captures 07 and 14 Apr
- Open risks
- 2
Next step
Find your starting point
Tell us your role and projects, and we suggest where the twin helps first.